KNOWLEDGEBASE - ARTICLE #934

How can I plot both a confidence band AND a prediction band with my linear regression line or nonlinear regression curve?

Prism lets you choose either a confidence band or a prediction band as part of the linear and nonlinear regression dialog. But not both. To plot both on one graph, you need to analyze your data twice, choosing a confidence band the first time and a prediction band the second time.

The regression lines or curves are data sets that you can add to any graph by drag-n-drop or using the Change menu from the graph.

Explore the Knowledgebase

Analyze, graph and present your scientific work easily with GraphPad Prism. No coding required.